In the weeks 28-31 we are closed due to the summer holidays. Have a nice summer!

+47 62 82 88 28 | marked@norskebacker.no |

Kanfa

Customer: Kanfa

Project: CO2- capture – Chemical industry

Problem/need:: As part of the process where CO2 is captured – the customer had a need to heat up amines

Solution: We calculated, designed and produced a heating flask for heating amines.
Due to the somewhat elevated temperature required for this process, the junction box is slightly raised from the heating element’s mounting flange

Details::

  • 195 kW – 400 volts
  • Weight: 435 kg
  • Temperature: 200*
  • Materials: Stainless steel (AISI 316)
  • Process control: No

Flere referanser

Prosess, Offshore
Kanfa
HVAC
Ventilation system
Maritime
Several customers
Mechanical
Avinor
Mechanical
Avinor
Processindustry
Elkem Island
Processindustry
HOFF Poteter
Offshore
Dugeleg